标(biāo)龍計量泵英(ying)文說明書
Dear users : Thank you for the purchase and use of Linhai Ligao Industrial Equipment Co., Ltd. (hereinafter referred to as "Ligao") series products. For your safety and interests of your use of the equipment prior to carefully read the product brochures and enclosed all the information. If you are not in accordance with the product specification use and operation, which led to the loss,we will not assume responsibility.
n The copyright belong to Ligao;
n •Brochure is an indivisible part of the product, please take good care of.
1.Adding #220 Worm Gear Oil or #50 gear oil to the oil standard before using the pump.
3.Before using, ensure that the export pipeline is free(the valve is open).
4.During the welding, never drop the welding bits or sundries into the pipe or valve body (or it will cause the water can not come out, the pressure and flow turn to small ).
To stop working close the metering pump first, then closed the valve exit.
5.Export pipeline pressure must be higher than the import pipeline pressure, if it is lower than the import pressure, we must install back-pressure valve, to prevent Siphon.
[返回(huí)]


客(ke)服咨詢(476949982)
浙公(gōng)網安備 33010602004897号